CV-Phase 2 Project
Alulite Forms CV-Phase 2 Project
![CV-Phase 2 Project](https://www.aluliteforms.com/wp-content/uploads/2022/11/CV-Phase-2-Project.jpg)
CV-Phase 2 Project
Project: CV-Phase 2 Project
Formwork: Aluminum Panel System for Monolithic Casting of wall, beam, slab and staicase
Formwork Quantity: 2082 sqm
Location: Jordan
Period: 2015-2016